Data CentreMultiple Sites, Australia

Telstra Data Centres

Delivered end-to-end HVAC control, rack infrastructure installation, energy management and environmental monitoring across multiple Telstra data centre facilities, improving PUE and operational efficiency.

1.6 → 1.35

PUE Improvement

22%

Cooling Energy Saved

200+

SM5000 Units Deployed

Multiple

Sites Managed

The Challenge

Telstra required a comprehensive building automation and control solution across their data centre portfolio. Existing systems provided limited granularity. HVAC control was basic, environmental monitoring only operated at the CRAH unit level rather than individual racks, and there was no integrated energy management or environmental analysis capability. With increasing rack densities, stricter customer SLA requirements and growing energy costs, Telstra needed a partner to deliver full HVAC control, IT rack infrastructure installation, continuous energy monitoring and detailed environmental analysis across multiple facilities.

Our Solution

Synchronous Building Automation delivered a complete data centre automation solution encompassing control, installation and monitoring. We installed Distech Controls ECLYPSE controllers for full HVAC management, including CRAH units with variable speed fan control, chilled water valve modulation and hot/cold aisle containment strategies. Our team installed IT rack infrastructure with SM5000 Multi-Sensor Data Acquisition Controllers and TH-485 temperature and humidity probes at each rack, providing granular inlet and exhaust monitoring via MQTT and Modbus TCP. Janitza UMG energy meters were deployed at PDU and mechanical switchboard level for real-time power measurement, continuous PUE calculation and energy cost allocation. All data feeds into the Sync DCiM Platform, enabling comprehensive environmental analysis, automated alerting for environmental excursions and ongoing performance optimisation.

Results

Achieved measurable PUE improvement across all facilities through integrated HVAC control and cooling optimisation
Eliminated hot spots through dynamic cooling control based on real-time rack-level data from SM5000 sensors
Delivered continuous energy monitoring and environmental analysis, enabling data-driven operational decisions
Reduced cooling energy consumption while supporting increased IT load density through precision HVAC control

Technologies Used

Distech Controls ECLYPSESM5000 MonitorTH-485 SensorsJanitza UMGSync DCiM PlatformMQTT