Data Centres

End-to-end HVAC control, rack infrastructure installation, energy management and environmental analysis for maximum uptime and PUE performance.

Performance

Data Centre PUE Monitoring

Real-time power usage effectiveness tracking with granular visibility into IT, cooling, and facility overhead.

PUE Performance
Live
1.32PUE2.01.0
Best in class
Total Facility1,422 kW
IT Load1,080 kW
Cooling Load280 kW
Overhead62 kW
Power Distribution
IT Load1080 kW (76%)
Cooling280 kW (20%)
Lighting & Other62 kW (4%)
12-Month PUE Trend-16.5%
1.61.3MarAprMayJunJulAugSepOctNovDecJanFeb
Containment Zones
Cold Aisle A
18.2°C/ 18°C
Cold Aisle B
18.5°C/ 18°C
Hot Aisle A
34.1°C/ 35°C
Hot Aisle B
36.8°C/ 35°C

PUE Monitoring

Track Power Usage Effectiveness in real time with granular visibility into IT load, cooling, and overhead power. Monitor hot and cold aisle containment zones and drive continuous PUE improvement across your data centre portfolio.

  • Real-time PUE tracking with live IT and cooling power metrics
  • Power distribution breakdown across IT, cooling, and overhead
  • 12-month PUE trend chart showing continuous optimisation
  • Hot and cold aisle containment temperature monitoring
  • Immediate alerts when zones deviate from setpoints
Industry Challenges

The Problems You Face

Common challenges in the data centres sector that we help you overcome.

Challenge 1

Maintaining consistent temperature and humidity within tight tolerances across thousands of square metres of server halls

Challenge 2

Achieving PUE targets below 1.4 while accommodating increasing compute density and heat loads

Challenge 3

Ensuring complete redundancy and failover for control, monitoring and environmental analysis systems with zero single points of failure

Ready to Transform Your Data Centres?

Let's discuss how our expertise in data centres can deliver measurable results for your organisation.